Designed for Higher IQ

GET LISTED ON GOOGLE SHOPPING ADS

Smarter Shopping, Better Results. Transform your product visibility with AI-driven optimization and real time analytics.

CLICK HERE →

Performance Overview

Last 30 days
Impressions 1.24M ▲ +18.6%
Clicks 78.5K ▲ +24.3%
Conversions 6.21K ▲ +32.1%
ROAS 4.62 ▲ +15.3%
1.24M Impressions
Google Shopping Connected ✓
Running Sneakers
Running Sneakers $59.99 In stock
Hoist  Imer AP 150 for scaffolding
Imer

Hoist Imer AP 150 for scaffolding

2 831,96 £
Sold by serwisbudowy.com
Go to Store

You'll be redirected to serwisbudowy.com

Description

Hoist Imer AP 150 for scaffolding

The hoist AP 150 was designed specifically for scaffolding assembly. The drive itself is attached to the first floor of the scaffolding. Equipped with a swivel block, the extremely lightweight frame is carried and mounted on the subsequent, overhanging scaffolding floors. Please note that in the case of attachment of the drive at the very bottom the maximum hoisting height (without rewiring the drive) is 40m. In order to increase the lifting height, the drive should be mounted as high as possible (this will allow to pull scaffolding up to 80m).  However, it should be remembered that then the winch will be controlled from above, by the frame taker. Of course, the Imer AP 150 scaffolding assembly winch, can be used at any later stage of the work, also to pull in all kinds of construction materials, with a maximum weight of 150 kg.

The hoist for scaffolding assembly Imer AP 150

Standard equipment: ✓ Motor with magnetic braking system ✓ Rotating boom with locking working position ✓ Control panel with emergency stop button on 5m neoprene cable ✓ Safety device against over-winding of the cable ✓ IP 67 16A connector ✓ Scaffolding terminals

Technical data

AP 150

Maximum capacity

150 kg

Av. full load lifting speed

30 m/min

Rope length

81 m

Steel rope

Ø 4 mm

Motor

230V/50Hz, 0.8 kW, 1350 rpm., 7,1 A

Weight

50 kg

SPL in operator's position