Brace for Warsaw scaffolding
You'll be redirected to serwisbudowy.com
Description
Bracing for Warsaw scaffolding
The role of the brace is to ensure the stability of the entire structure. You use it to stiffen the vertical axis of the scaffolding. The correct positioning of the braces at the initial level of the scaffolding will enable you to position the vertical structure.
TECHNICAL DATA:
Overall length: 230cm
Tube diameter: 26mm
Mounting tube diameter: inner 42.5mm, outer 48.5mm
Material: painted steel